Game Programming




 
game programming
Game Programming :: The Central Hub :: Introductions :: e impacted." A labour ministry official in Sao Pau - View Topic
Topic Rating: *****
Printable View
vive123654
Veteran Member
*****

Posts: 500
Status: Offline
Joined:  
pm

Reputation: 0%

e impacted." A labour ministry official in Sao Pau (23rd Oct 15 at 3:06am UTC)
MELBOURNE, Australia -- A 20-ace performance was not enough for big-hitting Milos Raonic as the Canadian fell 6-3, 1-6, 7-6(4) to Lleyton Hewitt in an opening match Wednesday at the Kooyong Classic. The eight-man event is considered the prime tune-up opportunity prior to Mondays start of the Australian Open, where the 22-year-old Raonic from Thornhill, Ont., has never been past the fourth round. "It was a tough loss, conditions were difficult," said Raonic, playing the tournament for the second year. "I just wasnt able to execute like I needed to. The tiebreaker was a big disappointment. "I had the match in hand and I wasnt able to keep it together, its too bad." Raonic, ranked 15th, was looking strong against Hewitt with a 3-0 lead in the final-set decider. But Raonics game faded in an onslaught of Hewitt winners as the 31-year-old tore it up in the tiebreaker. The defeat puts Raonic into the relegation round of the hybrid competition. "There are still matches here to play and its a learning experience," said Raonic. "Its still good to get tough matches leading into the Open, which is the major goal." Raonic and Hewitt duelled for an hour 45 minutes in conditions ranging from blinding sunlight to whipping wind, a trademark of the Kooyong venue which hosted the Australian Open until 1988. The Canadian lost the opening set in 37 minutes from a double-fault which gave Hewitt a 5-3 lead. The Canadian fought back in the second to level as Hewitts game stalled. Raonic has now lost twice to Hewitt after going out to the Australian at the third round of the Open a year ago. Nik Stauskas 76ers Jersey . Ryan OReilly started Los Angeles comeback from two goals down at 8:11 of the second period. Landeskog tied at 2-2 with 7:02 remaining in the period, beating Mathieu Garon on the first shot he faced after replacing Ben Scrivens. Jahlil Okafor 76ers Jersey . With an unusual offensive burst, the Kings proved their captain correct and headed back to San Jose with a flicker of hope. Justin Williams and Marian Gaborik scored two goals apiece, and the Kings emphatically avoided first-round playoff elimination with a 6-3 victory over the Sharks in Game 4 on Thursday night. http://www.shopthe76ersonline.com/womens-nerlens-noel-basketball-jersey/ .C. -- The buzz is back in Charlotte. Allen Iverson Authentic Jersey .cas NHL Play of the Year showdown continues today with a pair of goaltenders flashing their boots. Allen Iverson Black Jersey . In a gritty 94-92 Chicago Bulls victory over the Raptors on Wednesday night, D.J. Augustin returned to Toronto to face the team that waived him in December and led the way.SAO PAULO, Brazil -- Brazilian organizers are adding safety features where a worker died in the stadium hosting the World Cup opener, hoping to quickly reverse an order that halted construction in part of the venue. The addition of new safety rails on Tuesday comes a day after labour officials said the installation of 20,000 temporary seats at the Itaquerao stadium could not continue until safety concerns were addressed. On Saturday, a 23-year-old worker died after falling from about 26 feet while installing the seats needed for the opener. Fast Engenharia, the company in charge of the temporary structures, was yet to release information about a new construction timetable for the stadium, which was already delayed. The company said in a statement that it was preparing a report to show labour officials that all the necessary measures had been implemented. It said the report would be delivered by the end of the day on Tuesday. The company, which reiterated that all of its safety measures were in accordance with Brazilian regulations, said that after the analysis of the report it expected construction to "resume immediately so it could deliver the work by the established deadline." Before the accident, FIFA expected the venue to be ready about a month ahead of the June 12 opening match between Brazil and Croatia. Sao Paulos vice mayor didnt expect the work stoppage to cause significant delays to the stadiums construction, saying the installation of the temporary seats was a "relatively simple job." "Its not a complex situation," Nadia Campeao told Radio Estadao. "Even if work is stopped for a few days so the recommended adjustments can be made, it shouldnt alter the final timetable." FIFA and the local World Cup organizing committee released a statement downplaying the delay caused by the work interruption, which they called "t;standard procedure when accidents of this nature occur.dddddddddddd" "FIFA and the LOC support any efforts to improve workers safety by the authorities," the statement said. "Given the advanced state of the assembling of the temporary stands, we believe that the schedule for delivery of these areas will not be impacted." A labour ministry official in Sao Paulo said the construction stoppage was needed to eliminate the risk of another death. "If there are no additional safety measures, the work cant continue," Luiz Antonio de Medeiros told the Agencia Estado news service. "There was not enough protection, it was irresponsible." Fast Engenharia has denied any wrongdoing and said the worker had all required safety equipment available to him at the time of the accident. Investigators said an initial probe showed the worker didnt connect himself to a safety cable. According to witness accounts, he said he only had a "quick thing" to finish at the site. Medeiros said additional safety measures could have prevented the death even if the worker wasnt connected to his safety cable. The safety rails were being added around areas where workers installed the temporary seats. FIFA and the local World Cup organizing committee did not immediately answer requests for comments on the work stoppage. Construction was already behind schedule at the Itaquerao stadium because of the damage caused by another accident that killed two workers following a crane collapse in late November. A giant roofing structure fell on part of the stadiums facade, significantly pushing back the stadiums date of completion. The stadium, being built by popular Brazilian club Corinthians, is expected to cost about $490 million. In addition to the opener, it will host three group matches, one second-round game and one of the semifinals. NFL Jerseys Cheap China Jerseys Cheap Wholesale NFL Jerseys Cheap Jerseys Jerseys NFL Cheap ' ' '
 Printable View

All times are GMT+0 :: The current time is 9:30am
Page generated in 0.3219 seconds
Purchase Ad-Free Credits
This Forum is Powered By vForums (v2.4)
Create a Forum for Free | Find Forums